Small project
Up to 5,000 sq ft
$75per project
- Delivered in 2 days
- 1 revision included
- One division included
TriVolt Estimating is the outsourced estimating desk for electrical and low-voltage contractors. Upload your drawings, get a fixed-price quote in minutes, and receive bid-ready takeoffs with marked-up plans — all in your TriVolt client portal.
Already a client? Sign in to your portal
Accurate scoping and pricing built on real material, labor, and timeline numbers — not guesswork. Every takeoff comes with color-coded PDF markups, an Excel pricing workbook, and RFIs, assumptions & exclusions.
Structured cabling, data and wireless networks, voice, AV, access control, intrusion detection, and video surveillance. Six years and a track record of public-sector awards behind it.
Material and labor takeoffs and pricing for electrical scopes, built on real numbers so your bid covers cost and protects margin.
Technically sound, bid-compliant proposals, RFP responses, and submission documentation that hold up under evaluation.
Deep knowledge of USAC's Form 470/471 cycles and bid-evaluation criteria for school and cooperative work.
A law background means costly clauses in your bid documents and subcontracts get flagged before you sign — not after.
One simple formula: $75 covers the first 5,000 sq ft, then 0.6¢ per sq ft up to 25,000 sq ft and 1¢ per sq ft above that. The price is fixed before any work starts — no hourly surprises.
Up to 5,000 sq ft
$75per project
5,001 – 25,000 sq ft · $105 at 10,000
$75 – $195by building area
25,001 – 100,000 sq ft · $445 at 50,000
$195 – $945by building area
Extra divisions: each price covers one division (26, 27 or 28). Each additional division adds 50%.
Rush delivery: next day for Small and Medium, 3 days for Large, for 50% more.
Add-ons: contract & bid-document review $75, bid / RFP proposal package $125. Flat on any project, with one more day of delivery.
Always included: color-coded PDF markups, material takeoff, labor & material pricing in Excel, RFIs, assumptions & exclusions.
One request per bid: the building area is the whole bid's, every building and floor.
Over 100,000 sq ft: custom quote within 24 hours.
Six years of US estimating and bidding, including building a contractor's public-sector bidding capability from a cold start — cooperatives and Education Service Centers, GSA, SAM.gov, and the USAC E-Rate program — with competitive awards publicly listed on USAC's Open Data Tool.
Create a project in the client portal with the building area, divisions and bid date, and upload the drawing set.
Your fixed price is calculated as soon as you submit. Nothing starts until you approve it.
See where every project stands, from approved to delivered, ahead of your bid date.
Check the marked-up drawings and quantities online, then download the Excel workbook and PDF.
Create a project, upload the drawings, and get a fixed-price quote in minutes. You receive the finished takeoff first; the invoice comes with it, due on receipt, paid by bank transfer or card. Pay within 3 days and your files stay open.
raduprodan@trivoltestimating.com